New Dock Construction in Miami: Depth Rules
New dock construction in Miami starts with a depth reading, not a drawing. The county sets four feet at mean low water for new boat slips. Then it lists who is exempt.
Four feet, and the exceptions
Have a shallow canal behind the house? Read (d) twice. It covers bulkheaded man-made canals with land on both sides.
(3) In addition to the applicable evaluation factors found in Section 24-48.3(1)(a) through (i) above, boat slips created by the construction or placement of fixed or floating docks, piers, piles and other structures requiring a permit under this article and located in tidal waters within the geographical boundaries of Miami-Dade County, Florida shall have a minimum water depth of four feet N.O.A.A. mean low water datum. It shall be unlawful to moor or store vessels at fixed and floating docks, piers, piles and any structure requiring a permit under this article in tidal waters within the geographical boundaries of Miami-Dade County in areas with less than four feet of depth N.O.A.A. mean low water datum except for those existing structures which were constructed or placed in accordance with all of the requirements of the Code of Miami-Dade County, Florida prior to October 11, 1985. The foregoing requirements in this subsection (3) shall not apply to:
(a) Fixed or floating docks or piers in tidal waters which are utilized exclusively for fishing, viewing Biscayne Bay, or swimming and which do not have one or more slips or mooring or fender piles present or proposed at or adjacent to the dock or pier, or
(b) Fixed or floating docks or piers in tidal waters which are utilized exclusively for launching canoes or kayaks, or
(c) Construction or placement of davits in tidal waters, provided that the davits are attached to seawalls or bulkheads, or
(d) Fixed or floating docks, piers or boat slips in tidal waters created by work requiring a permit under this Article if located in artificially created canals, provided the canal is bulkheaded and bordered by uplands on both sides of the canal, or
(e) Floating vessel platforms and floating boat lifts in tidal waters which qualify for the exemption contained within Section 403.813(2)(s), Florida Statutes.
(f) Installation of boat lifts, davits and mooring piles, in slips at existing permitted docks and piers.
(g) Repair or reconstruction of existing legal docks provided there is a minimum water depth of three feet N.O.A.A. mean low water datum.
Additionally, no permit shall be issued for a proposed slip or for any other proposed work requiring a permit under this Article which is to be used for the mooring or securing of a vessel, unless adequate water depth exists, including when the vessel is fully loaded.
Dredging for a dock on Biscayne Bay
On the bay, the state limits dredging to the minimum, and only with a finding about water quality.
(b) No further dredging or filling of submerged lands of the preserve shall be approved or tolerated by the board of trustees except:
3. Such minimum dredging and filling as may be authorized for the creation and maintenance of marinas, piers, and docks and their attendant navigation channels and access roads. Such projects may only be authorized upon a specific finding by the board of trustees that there is assurance that the project will be constructed and operated in a manner that will not adversely affect the water quality and utility of the preserve. This subparagraph shall not authorize the connection of upland canals to the waters of the preserve.
Width limits are on the county permit page. Structure and loads are on the city rules page.